19-02-2024, 12:42 AM
(18-02-2024, 07:55 PM)Stuart Wrote: Nothing I've seen looks like a sign of 'investment'. Quite the opposite.
Nonsense. Do the new studios need tweaking? Yes. But that doesn't take away from the fact that they have made a huge investment in the channel over the past few months.
The newsroom studio at Millbank with the new cameras, peds, lighting rig, desk, LED screens and general infrastructure is a £250,000 project at the very minimum. The refurbishment of the main Millbank studio could easily end up costing £1,000,000 if it includes an screen upgrade.
3 prime time shows presented by 3 different presenters in 3 different studios costs a fortune. Each show requires its own team. There's also a new podcast studio, too.