29-03-2024, 03:09 PM
The main studio at Westminster appears to be making progress. On Wednesday and Thursday's Politics Hub, the LED screen in the main studio was visible again in the background through the glass. It's been off for the last month. I suspect the studio will be ready for the local elections in May.
Hopefully this means that the striped frosted glass will be removed or replaced soon. It looks terrible.
Hopefully this means that the striped frosted glass will be removed or replaced soon. It looks terrible.